Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Details of Project:
(a)Name of the project(s) ACC Ltd. Ametha Cement Grinding Unit
(b)Name of the Company / Organisation M/s ACC Limited
(c)Registered Address ACC Limited, Kymore Cement Works,Katni,Madhya Pradesh-483880
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Manoj Jindal
(b)Designation (Owner/ Partner/ CEO) DirectorPlant
(c)Address ACC Limited, Kymore Cement Works,Katni,Madhya Pradesh-483880
(d)Pin code 483880
(e)E-mail vikash.kumar@acclimited.com
(f)Telephone No. 279927
(g)Fax No. 272303
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity3(b) Cement plants
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/MP/IND/53244/2019
(e)Master Proposal Number(Single Window) SW/153750/2020
(f)EAC concerned (for category A Projects only) Industrial Projects - 1
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 77, 83/1, 82, 81, 79, 78
(b)Pincode 483880
(c)Bounded Latitudes (North) FROM 24.0101 To 24.0111
(d)Bounded Longitudes (East) FROM 80.5306 To 80.5326
(e)Survey of India Topo Sheet No. 63 D/8,12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 387
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 5.0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshKatniVijayraghavgarhAmetha
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 6523/2019
(b)Date of Apply of TOR 13 Sep 2019
(c)Date of Issue of TOR / Standard ToR 30 Oct 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :12 Dec 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :15 Jan 2020
Distance of Public Hearing Venue from the Proposed Project :0.1
Project Site
State :Madhya Pradesh
District :Katni
Tehsil :Vijayraghavgarh
Village :Ametha
526employment for local people.District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Cement Grinding UnitVertical Roller Mill2.0 MTPA cement Grinding Unit
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cement Grinding2.0OthersMillion Ton Per AnnumRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. 00
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 200
(b) Funds Allocated for Environment Management (Capital) (in crores) 30.0
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 3.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 1.75
(e) Funds Allocated for Environment Management Capital(%) 15.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1200000.0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1200000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Clinker(Dry)1.24OthersMTPAproposed own unitConveyor Belt0.1 CaptiveCopy of Linkage
(2.)Gypsum Dry0.10OthersMTPAopen marketRoad,Rail600 Othersopen marketCopy of Linkage
(3.)Electricity29OtherskWh/tMPSEBOthersMPSEB GRID0.2 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube63.7443.7962.74100
(2.)PM2.5Micro Gram per Meter Cube28.8915.6128.1260.0
(3.)NOxMicro Gram per Meter Cube14.478.014.4180.0
(4.)SO2Micro Gram per Meter Cube7.775.547.5780.0
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l48.033.0100.0100.0
(2.)TDSmg/l348.0128.0500.002000.0
(3.)Chloridesmg/l25.9918.12250.001000.0
(4.)Heavy MetalsFemg/l0.050.050.301.0
(5.)Fluoridemg/l0.950.101.01.5
(6.)pHNA7.206.746.59.5
(7.)Total Hardnessmg/l336.0148.0200.0600.0
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.877.39C
(2.)DOmg/l4.53.6C
(3.)BODmg/l2.02.0C
(4.)CODmg/l10.010.0C
    14.4.     No. of Ambient Noise Monitoring Locations : 8.0
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))44.633.3045.0
(2.)Leq(Day)A-weighted decibels(dB(A))50.241.055.0
    14.5.     No. of Soil Sample Monitored Locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare313.60188.16
(2.)Electric ConductivityOthersmicroohms/cm190.038.42
(3.)P(Phosphorus)Kilogram per hectare30.7316.66
(4.)pH8.117.08
(5.)K(Potassium)Kilogram per hectare725.76159.71
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 35
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 25
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface1152.0Copy of Permission LetterPipelineOtherspipe line0120 May 2020115
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste4.05.0STPGreen Belt Renewal Plant4.0
16.1.
(a)Total Waste Water Generation 4
(b)Total Discharged Water 0
(c)Total Reused Water 4
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5.0Tons0.1RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube63.746.40.5063.74100
(2.)NOxMicrogram per Meter Cube8.06.40.058.0580.0
(3.)SO2Microgram per Meter Cube6.06.40.056.0580.0
(4.)PM2.5Microgram per Meter Cube24.976.40.0525.0260.0
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Cement Millelectricity102.5PM1015.0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 29000
(b)Source MPSEB
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 500.00
(e)Stack Height (in m) 5.0
20.
Land Ownership Pattern:
(a)Forest Land 00
(b)Private Land 00
(c)Government Land 00
(d)Revenue Land 5.1
(e)Other Land 00
    Total Land 5.1
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 00
(b)Waste/Barren Land 00
(c)Grazing/ Community Land 00
(d)Surface Water Bodies 00
(e)Settlements 00
(f)Industrial 5.1
(g)Forest 00
(h)Mangroves 00
(i)Marine Area 00
(j)Others : 100% 00
    Total 5.1
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant3.1
(2.)Green belt2.0
Total 5.1
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSbandhavgarh50more than 50 km
(2.)NPANA50NON WITHIN 10 KM
(3.)ESZsNA50NON WITHIN 10 KM
(4.)CorridorsNA50NON WITHIN 10 KM
(5.)Critically Polluted AreaNA50more than 50 km
(6.)ESAsNA50NON WITHIN 10 KM
(7.)Wildlife CorridorsNA50NON WITHIN 10 KM
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA90NIL WITHIN 10 KM
(2.)ForestSurma reserve forest0.8--
(3.)Archaeological SitesNA10NIL WITHIN 10 KM
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 5.1
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NIL
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required DIVERSION HAS BEEN DONE BY REVENUE DEPT OF KATNI
(ii)Details of Study Conducted EIA
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 500
(d)Temporary Employment- During Operation 60
(e)No. of working days 330
(f)Total Manpower 690
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 2.0
(b)Percentage of Total Project Area 39.22
(c)No. of Plants to be Planted 5000
(d)Funds Allocated for Plantation 10.0
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialLOCAL PEOPLE WILL GET EMPLOYMENT IN PROJECT
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. RA0071
(ii)Name of the EIA Consultant Creative Enviro Services
(iii)Address 42 doorsanchar nagar Gulmohar Bhopal
(iv)Mobile No. 9425043383
(v)Landline No. 0755427638
(vi)Email Id mukeshkaore@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 18 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(b)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(c)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(f)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantManoj Jindal
DesignationDirectorPlant
Name of Company (Applicant Name should not be given here)M/s ACC Limited
AddressACC Limited, Kymore Cement Works
Print