Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Details of Project:
(a)Name of the project(s) Proposed Limestone Mine (Area: 52.353 ha) with Limestone Production Capacity 1.0 Million TPA and Waste 0.5 Million TPA (Total Excavation 1.5 Million TPA at Villages Kundla, Suvakheda, Morka & Segwa,
(b)Name of the Company / Organisation M/s. UltraTech Cement Ltd.
(c)Registered Address Ahura Centre, 1st Floor, ‘A’ Wing , Mahakali Caves Road, Andheri (E), Mumbai- 400 093 ,Mumbai City,Maharashtra-400093
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Dr. K.V. Reddy Reddy
(b)Designation (Owner/ Partner/ CEO) Senior Vice President & Corporate Hea
(c)Address
(d)Pin code 400093
(e)E-mail kvijender.reddy@adityabirla.com
(f)Telephone No. 66917422
(g)Fax No. 28244970
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/MP/MIN/50237/2018
(e)Master Proposal Number(Single Window) SW/139120/2020
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. khasra map uploaded with EIA report
(b)Pincode 400093
(c)Bounded Latitudes (North) FROM 24331.63 To 243411.61
(d)Bounded Longitudes (East) FROM 745121.3 To 74520.8
(e)Survey of India Topo Sheet No. G43U14,G43U15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 476
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 4.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshNeemuchJawadKundla, Suvakheda, Morka & Segwa
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11015/30/2018-IA.II(M)
(b)Date of Apply of TOR 01 Mar 2018
(c)Date of Issue of TOR / Standard ToR 10 May 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :27 Mar 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :05 Jul 2019
Distance of Public Hearing Venue from the Proposed Project :2
Village Goraka, Tehsil- Jawad District- Neemuch (M.P)
State :Madhya Pradesh
District :Neemuch
Tehsil :Jawad
Village :Goraka
171Issues regarding drinking water facilities, repair of school roofs, compensation against damaged agriculture, facilities of government houses and taps, road repair, construction of waiting rooms etcDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Dozers1
(2.)Drill machine 115 mm dia1
(3.)Explosive van1
(4.)Water tanker2
(5.)Explosive van1
(6.)Motor grader1
(7.)Compactor1
(8.)Mobile Lighting tower4
(9.)Hydraulic Excavator3
(10.)Dumper 30 ton8
(11.)Mobile service van1
(12.)Rock Breaker – Secondary1
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Area52.353HectaresOthers-
(2.)Lime stone1.0OthersMillion Tonne Per AnnumOthersHaul road by dumpers
(3.)Waste0.5OthersMillion Tonne Per AnnumOthersHaul Road
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 17
(b) Funds Allocated for Environment Management (Capital) (in crores) 1.20
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.34
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.184
(e) Funds Allocated for Environment Management Capital(%) 7.06
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 60000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 60000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD/Fuel60000OthersLitreIOCL/BPCLRoad300 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube18.55.918.24880
(2.)NOxMicro Gram per Meter Cube22.26.921.89480
(3.)PM10Micro Gram per Meter Cube90.452.289.636100
(4.)PM2.5Micro Gram per Meter Cube52.428.351.91860
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)TDSmg/l757.25516.755002000
(3.)Chloridesmg/l197.583.72501000
(4.)Fluoridemg/l0.510.321.01.5
(5.)OthersCalciummg/l158.2105.375200
(6.)pHNA7.977.026.58.5
(7.)Total Hardnessmg/l514.8307.33200600
(8.)Heavy MetalsLeadmg/l0.0080.0080.010
    14.3.     No. of Surface Water Monitoring Locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l00D
(2.)BODmg/l00D
(3.)OthersCalciummg/l00D
(4.)CODmg/l00D
(5.)pHNA00D
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))44.836.1I-70 to 75, C- 55 to 65, R-45 to 55, S-40 to 50
(2.)Leq(Day)A-weighted decibels(dB(A))54.746.2I-70 to 75, C 55 to 65, R- 45 to 55,S-40-50
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersµs/cm0.760.32
(2.)pH8.107.76
(3.)N(Nitrogen)Kilogram per hectare159.5141.3
(4.)P(Phosphorus)Kilogram per hectare12.510.5
(5.)K(Potassium)Kilogram per hectare175.4151.7
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 34.7
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 13.8 To 16.2
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. NIL
(f)Date of Issue 29 Jan 2020
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersHarvested Rainwater1451.5 Not Appliacble PipelineOthersPumpingNIL29 Jan 2020145
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Mine office & Rest Shelter0.82Septic TankOthersSeptic Tank0.80
16.1.
(a)Total Waste Water Generation 0.8
(b)Total Discharged Water 0
(c)Total Reused Water 0.8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OverburdenOthersMine waste500000Tons0RoadOthersWill be used for backfilling the excavated area
(2.)SoilOthersMining waste33912Tons0OthersHaul roadOthersPlantation
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube22.201.924.180
(2.)PM2.5Microgram per Meter Cube52.400.3252.7260
(3.)PM10Microgram per Meter Cube90.400.9791.37100
(4.)SO2Microgram per Meter Cube18.501.319.880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000Others0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 250
(b)Source Captive Thermal Power Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) CPP/grid
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 24.565
(c)Government Land 27.788
(d)Revenue Land 0
(e)Other Land 0
    Total Land 52.353
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 24.565
(b)Waste/Barren Land 27.788
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : other 0
    Total 52.353
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt5.45
(2.)Built Up Area0.93
(3.)Quarry Area37.13
(4.)OB Dump Area6.2405.1 ha for OB dump & 1.14 for mineral storage
(5.)OthersUndisturbed2.603
Total 52.353
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone00
(2.)ESAsNone00
(3.)NPANone00
(4.)Wildlife CorridorsNone00
(5.)WLSNone00
(6.)ESZsNone00
(7.)CorridorsNone00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestJharoti RF7.50
(2.)OthersReserve ForestJuna Bir RF90
(3.)Archaeological SitesNone00
(4.)Defence InstallationsNone00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4.256
(b)Land yet to be acquired(Ha) 48.097
(c)Status of Land acquisition if not acquired Under Process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 4
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 54
(e)Funds Allocated for R&R(in Rs) 3669.2
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Leopard (Panthera pardus) Indian Python (Python molurus), Indian Peafowl (Pavo cristatus) and Monitor Lizard (Varanus bengalensis)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 40.5 lakh
(iii)Period of Implementation In next 10 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Seasonal Gambhiri River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 4.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 83
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 320
(f)Total Manpower 83
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 23.32
(b)Percentage of Total Project Area 44.54
(c)No. of Plants to be Planted 13625
(d)Funds Allocated for Plantation 99.1
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe project will enhance the aesthetic beauty of the environment.
(2.)SocialThe proposed project will help in improving the socio-economic status of the near-by villagers by generating direct or indirect employment opportunities. Company has allocated INR 34lakhs towards CER
(3.)FinancialThe Project will contribute additional revenue to the State and Central Govt. in the form of royalty, cess and other taxes etc. Job opportunities to the local people will improve the earning and spend
(4.)OthersThe Project will generate direct and indirect employment. The manpower requirement for the project is 83 persons.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)LimestoneMajor
2.
Mine Capacity in ROM (Run of Mine) 1000000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MP/NEEMUCH/LIMESTONE/MPLN/G-19/17-18/2770
(b)Date of Approval 18 Aug 2017
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 52.353
(f)Approved Capacity 1.0
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 32.2
(b)Mineable Reserves (Million Ton) 17.02
(c)Extractable Reserves(Million Ton) 17.02
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 44
(f)Stripping Ratio 1 : 0.05
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 23
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 52.353
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 19 Jun 2013
(iii)Validity of LOI 0.2
(iv)Reference No. of LOI Ref No. F 3-2/2016/12-1
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 52.353
(iii)Validity of the lease deed From : 29 Jun 2018 To : 28 Jun 2068
(iv)Date of Execution of Mining Lese 29 Jun 2018
(v)Reference Number MP279462018A1459793
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof This is fresh lease
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 1
(ii)Total Area (in Hectare) 5.1
(iii)Height (in meter) 24
(iv)Quantity (in Million Cubic meter) 0.52
(v)No. of year back fill up 6
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 12.77
(iii)Height (in meter) 50
(iv)Quantity (in Million Cubic meter) 5.49
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0.195
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0.195
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 24.36
(b)Depth (in meter) 50
(c)Volume (in Million Cubic meter) 12.12
12.
Details of Quarry:
(a)Final Void of 24.36 (hectare) at a Depth of 50 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 37.13
13.
Details of Transportation:
(a)In Pit/Underground to Surface none
(b)Surface to Siding/Loading none
(c)Transportation / Conveyor Details From working face to crusher (located in VCLM-II)
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)WASTE LAND24.565024.565
(2.)GRAZING LAND000
(3.)FOREST LAND000
(4.)SETTLEMENTS000
(5.)SURFACE WATER BODIES000
(6.)AGRICULTURE LAND27.788027.788
(7.)OTHERS(Specify)Other000
TOTAL52.353052.353
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)INTERNAL OB DUMPS5.1005.1
(2.)GREEN BELT5.45005.45
(3.)OtherMineral Storage001.141.14
(4.)EXCAVATION/QUARRY12.7724.36037.129999999999995
(5.)EXTERNAL OB DUMPS0000
(6.)BUILT UP AREA (COLONY/OFFICE)000.20.2
(7.)TOP SOIL STORAGE0000
(8.)ROADS000.730.73
(9.)VIRGIN AREA002.6032.603
TOTAL23.3224.364.673052.353
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 5.1
(c)Quarry(in hectare) 37.13
(d)Safety Zone(in hectare) 5.45
(e)Final Void of 24.36 (hectare) at a Depth of 50 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 12.77
(h)Total afforestation plant (in hectare) 23.32
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA 097
(ii)Name of the EIA Consultant J.M. EnviroNet Pvt. Ltd.
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram (Haryana) – 122001
(iv)Mobile No. 9509267011
(v)Landline No. 0124414192
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 05 May 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(b)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(c)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(f)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)04/02/2020Your case is not registered in MPSEIAA , therefore for registration we require all supportive documents . So please upload Form-1,PFR, EIA Report, public hearing copy,complete approved mining plan with approval letter & maps ,DFO information regarding Appendix-1 (1 to 4 points information),Lease sanction letter/order, Lease deed ,Khasra Panchsala, NOC gram panchayat or shabha. Please see MPSEIAA O.M.Dated 20.06.2019.
(2.)04/02/2020Your case is not registered in MPSEIAA , therefore for registration we require all supportive documents . So please upload Form-1,PFR, EIA Report, public hearing copy,complete approved mining plan with approval letter & maps ,DFO information regarding Appendix-1 (1 to 4 points information),Lease sanction letter/order, Lease deed ,Khasra Panchsala, NOC gram panchayat or shabha. Please see MPSEIAA O.M.Dated 20.06.2019.
(3.)24/02/2020The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDr. K.V. Reddy Reddy
DesignationSenior Vice President & Corporate Hea
Name of Company (Applicant Name should not be given here)M/s. UltraTech Cement Ltd.
AddressAhura Centre, 1st Floor, ‘A’ Wing , Mahakali Caves Road, Andheri (E), Mumbai- 400 093