Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Details of Project:
(a)Name of the project(s) Kotha Barrage Major Irrigation Project
(b)Name of the Company / Organisation Madhya Pradesh Water Resources Department
(c)Registered Address O/o Engineer-in-Chief, Water Resources Department, Jal Sansadhan Bhawan, Tulsi Nagar, Bhopal.,Bhopal,Madhya Pradesh-462003
(d)Legal Status of the Company
2.
Address for the correspondence:
(a)Name of the Applicant
(b)Designation (Owner/ Partner/ CEO) Enviroment Consultant
(c)Address O/o Engineer-in-Chief, Water Resources Department, Jal Sansadhan Bhawan, Tulsi Nagar, Bhopal.,Bhopal,Madhya Pradesh-462003
(d)Pin code 462003
(e)E-mail environment.mpwrd@gmail.com
(f)Telephone No.
(g)Fax No. 2421063
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(c) River Valley projects
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/MP/RIV/51150/2016
(e)Master Proposal Number(Single Window) SW/143418/2020
(f)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 122, 123, 124, 126, 128, 129
(b)Pincode 464221
(c)Bounded Latitudes (North) FROM 210455.70 To 795236.95
(d)Bounded Longitudes (East) FROM 2648031.64 To 26774476.0
(e)Survey of India Topo Sheet No. 54L/4 and 54H/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 395
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshVidishaKurwaiKotha
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-12011/05/2016-IA-I (R)
(b)Date of Apply of TOR 11 Jan 2016
(c)Date of Issue of TOR / Standard ToR 09 Dec 2016
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :08 Jun 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :10 Jul 2019
Distance of Public Hearing Venue from the Proposed Project :3
Village- Kakarua , Panchayat - Nagvasa, District- Vidisha
State :Madhya Pradesh
District :Vidisha
Tehsil :Kurwai
Village :Kakarua
1381. Shri Naresh Kuamr S/o Shri Heera lal Yadav of village Chulheta, Tehsil Ganj Basoda, District Vidisha submit that there is a way to reach to his farm at Khara no. 330 via river. Due to the submergenOthersSub-Divisional Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Right rising main11.50 km long and 1.60m diameter (26m lift)
(2.)Left rising main8.50 km long and 1.60m diameter (31m lift)
(3.)Vertical lift gates32 fixed wheel (15000 mm x 11500 mm)
(4.)Barrage576 m long, 16.50m high 32 bays
(5.)Baycrest level 384.5 masl, pond level 396 masl
(6.)Distribution network2.50 ha chak
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)CCA20000HectaresOtherspiped gravity pipe lines
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 750.75
(b) Funds Allocated for Environment Management (Capital) (in crores) 163.93
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 7.51
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 1.93
(e) Funds Allocated for Environment Management Capital(%) 21.84
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 252000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 252000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)sand50000OtherscumIndiaRoad10 OthersPDFCopy of Linkage
(2.)Earth80000OtherscumIndiaRoad10 OthersPDFCopy of Linkage
(3.)Stone12000OtherscumIndiaRoad10 OthersPDFCopy of Linkage
(4.)Aggregate110000OtherscumIndiaRoad10 OthersPDFCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jul 2017 To 31 May 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 06
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube37.827.037.560
(2.)SO2Micro Gram per Meter Cube0.00.00.080
(3.)NOxMicro Gram per Meter Cube24.110.722.880
(4.)PM10Micro Gram per Meter Cube51.038.744.4100
    14.2.     No. of Ground Water Monitoring Locations : 09
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l496116200600
(2.)Chloridesmg/l427.5319.02501000
(3.)Fluoridemg/l0.920.1411.5
(4.)pHNA7.866.866.88.5
(5.)TSSmg/l000100
(6.)TDSmg/l8903175002000
    14.3.     No. of Surface Water Monitoring Locations : 07
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l1.20.9C
(2.)pHNA7.827.41C
(3.)CODmg/l14.466.43C
(4.)DONA00C
    14.4.     No. of Ambient Noise Monitoring Locations : 06
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))59.837.455
(2.)Leq(Night)A-weighted decibels(dB(A))59.1844.7945
    14.5.     No. of Soil Sample Monitored Locations : 06
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram250.8175.2
(2.)pH7.657.28
(3.)P(Phosphorus)Milligram per Kilogram9.87.9
(4.)Electric ConductivityMillisiemens per Centimetre278219
(5.)N(Nitrogen)Milligram per Kilogram155.580.1
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 16.2 To 2.8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.01 To 9.58
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater4000Copy of Permission LetterPipelineOthersTankerNA27 Aug 20180
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic wastewater by 200 persons1620STPGreen Belt Renewal Plant16
16.1.
(a)Total Waste Water Generation 16
(b)Total Discharged Water 0
(c)Total Reused Water 16
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MSWMunicipal Solid Waste54Tons0OthersDumpersSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube55.00.414.1469.14100
(2.)SO2Microgram per Meter Cube00.40080
(3.)PM2.5Microgram per Meter Cube00.40060
(4.)NOxMicrogram per Meter Cube14.350.40.10080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Nearest sub-station/ transformer03.50.15PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source Nearest Sub-station/transformer
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2*200
(e)Stack Height (in m) 3.5
20.
Land Ownership Pattern:
(a)Forest Land 0.00
(b)Private Land 681
(c)Government Land 678
(d)Revenue Land 0
(e)Other Land 0
    Total Land 1359
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 195745
(b)Waste/Barren Land 6580
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 3164
(e)Settlements 5664
(f)Industrial 0
(g)Forest 10934
(h)Mangroves 0
(i)Marine Area 0
(j)Others : NA 0
    Total 222087
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersSubmergence/dam seat/appurtenant works1359
Total 1359
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0NA
(2.)CorridorsNA0NA
(3.)ESZsNA0NA
(4.)Critically Polluted AreaNA0NA
(5.)WLSNA0NA
(6.)Wildlife CorridorsNA0NA
(7.)NPANA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)ForestNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.00
(b)Land yet to be acquired(Ha) 681
(c)Status of Land acquisition if not acquired Under Process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 638
(e)Funds Allocated for R&R(in Rs) 14158.0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Betwa/Kevtan rivers
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required 103.50 MCM
(ii)Details of Study Conducted water for irrigation shall be diverted from dam
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Naren River
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 4
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 385
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 400
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 27
(b)Percentage of Total Project Area 1.99
(c)No. of Plants to be Planted 41500
(d)Funds Allocated for Plantation 55
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Financial• Benefits to economy and commerce. • Recreation and tourism potential may boost • Better opportunities for cattle rearing.
(2.)Environmental• Improvement in environment through implementation of CAT, Compensatory Afforestation, Green belt Development and different other plans. • Increase in groundwater level
(3.)Social• Better living Standards for famers of command area. • Access to improved infrastructure facilities.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Irrigation Project
2. Name of the River Betwa River, tributary of Yamuna River
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? No
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Barrage16.5576135930760200002550020000
5.
Powerhouse Installed Capacity No
(a) Type of Powerhouse Surface
(b) Capacity (in megawatts) 0
(c) No. of Tunnels 0
(d) No. of Units 0
(e) Bank of River Both
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 0
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)50 %2061.101963NA
(2.)75 %1593.991907NA
(3.)90 %1184.92007NA
(c) Machine Availability (in percent) 0
(d) Cost of Electricity Generation (in INR) 0
(e) Internal Rate of Return (in percent) 0
(f) Year of achievement of Internal Rate of Return 0
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 835000
(c) Utilized for Construction (in cubic meter)768000
(d) No. of Muck Disposal sites1
(e) Total Muck Disposal Area (in hectare)3
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 3
(c) Name of the umbrella Fish Species (Scientific Name)Rohu. Carps Catla, Mirgal
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Lean0.240.96
(2.)Non-Lean Non-Monsoon0.249.72
(3.)Monsoon218.567.9
11. Free Flow Stretch (in km) 61.77
12.
Approval of Central Water Commission No
13.
Approval of Central Electricity Authority No
14.
Details of Coffer Dam (Upstream) None
15.
Details of Coffer Dam (Downstream) None
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/RA182 AC meeting,dt.16.11.2018
(ii)Name of the EIA Consultant VOYANTS SOLUTIONS PRIVATE LIMITED
(iii)Address 403, 4TH FLOOR, PARK CENTRA, SECTOR-30, NH-8, GURUGRAM-122001, INDIA
(iv)Mobile No. 9989673334
(v)Landline No. 0124459820
(vi)Email Id santosh@voyants.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 09 Jun 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(b)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(c)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(f)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicant
DesignationEnviroment Consultant
Name of Company (Applicant Name should not be given here)Madhya Pradesh Water Resources Department
AddressO/o Engineer-in-Chief, Water Resources Department, Jal Sansadhan Bhawan, Tulsi Nagar, Bhopal.
Print