Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
1. Basic Informations
Project Name M/s. Indore Municipal Corporation Company/Organisation Name M/S. INDORE MUNICIPAL CORPORATION
Registered Address Khasra no 220, Sanawadia Village, Indore Mandal & District, Madhya Pradesh Madhya Pradesh 452016 Legal Status of the Company State Government
2.
Address for the correspondence:
(a)Name of the Applicant Mahesh Sharma
(b)Designation (Owner/ Partner/ CEO) SE
(c)Address Indore Municipal Corporation , 107, 109, First floor Palika Plaza Indore,,Indore,Indore,Madhya Pradesh-452007
(d)Pin code 452007
(e)E-mail indoremunicipal@gmail.com
(f)Telephone No. 23816373
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(a) Building and Construction projects
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number SIA/MP/MIS/104294/2019
(e)Master Proposal Number(Single Window) SW/104290/2019
(f)EAC concerned (for category A Projects only) Infrastructure and Miscellaneous Projects  +  CRZ
(g)Project Type(New/Expansion/Modernization) Fresh EC
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshIndoreIndoreNihalpurmundi
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? No
(c)Reason Public hearing not required as the project comes under category B2
(d)Supporting Document Copy of Supporting Document
Project Profile
Location of the project Village Nihalpurmundi, Tashil Rau District Indore Madhya Pradesh
Town / Village
(Name of more than one town may be entered by separating with)
Village Nihalpurmundi, Tashil Rau District Indore Madhya Pradesh Plot/Survey/Khasra No.
(Name of more than one town may be entered by separating with)
Plot / Survey / Khasra No 1020
State Madhya Pradesh District Indore
Tehshil Indore Pincode 452002
Nearest railway station Rajendra Nagar Railway Station Distance from the project site 4.5
Nearest airport Indore Airport Distance from the project site 9.46
Nearest Town/City/District Headquarters indore Distance from the project site 8.5
Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) Village Nihalpurmundi, Tashil Rau District Indore Madhya Pradesh Upload GPS file Uploaded GPS file
Shape of the project land Block (Polygon) Site alternative under consideration(If any) Uploaded Site alternative under consideration
Brief summary of project Uploaded Brief summary of project
Does your project location falls under out of any following areas Indore (M.P.)
Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) 109274.18 Existing Built Up Area(In Meter /Sqr) 0
Does it attract any of the general conditions given below? No
Does it attract the specific condition given below? No
Interlinked Projects No
Whether separate application of interlinked projects has been submitted? Date of Submission
Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? No
Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? No
Whether the proposal involves approval/clearance under the C.R.Z notification,2011? No
Whether there is any Government Order/Policy relevent/relating to the site? No
Forest land involved(hectares) 0
Is there any litigation pending against the project? No


Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes Permanent change in land use will occur due to Construction of residential Building. Project site is a plain land with small bushes and grass.
1.2 Clearance of existing land, vegetation and buildings? No Proposed project having only small shrubs. There are no existing building and major vegetation at site.
1.3 Creation of new land uses? Yes The proposed site will be used for construction of Residential Building.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil testing is in process.
1.5 Construction works? Yes Construction of Residential Building.
1.6 Demolition works? No No Demolition works are envisaged as there are no old structures in the proposed site.
1.7 Temporary sites used for construction works or housing of construction workers? Yes Most of the workers will be hired from the nearby areas. Temporary sheds will be provided for security persons and outside laborers.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes The proposed construction involves development of Residential Building which requires adequate engineered earthworks. Excavation will be done for construction of footing & foundations. The excavated soil of about 54,203.00 cum would be used within the site for leveling & for internal roads.
1.9 Underground works including mining or tunneling? No No underground work including mining or funneling will be done. Only Excavation will be done for construction of footing & foundations.
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? No Not Applicable
1.14 Facilities for storage of goods or materials? Yes Temporary site office/Room/Shed at site.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Construction Phase • Solid waste generated during construction Phase will be Excavated Material, Cement Bags, Bricks, concerts, MS Rods, Tiles, Wood Etc. • Construction waste will be segregated into recyclable/reusable and discarded material. Recycled material will be sold to authorized vendors. • Excavated soil : Top Soil will be stored separately and will be used for landscaping. • Domestic Waste generated by workers at site will be disposed as per the norms. Operational Phase • Sewage G
1.16 Facilities for long term housing of operational workers? No Temporary site office/Room/Shed at site.
1.17 New road, rail or sea traffic during construction or operation? No Not Applicable
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Site is well connected to road and rail network. NH-3 is about 500 mtrs from the site.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Applicable
1.20 New or diverted transmission lines or pipelines? No None envisaged
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No None envisaged
1.22 Stream crossings? No None envisaged. There is no stream crossing in the proposed site.
1.23 Abstraction or transfers of water from ground or surface waters? Yes Tanker water will be used for construction water and Indore Nagar Nigam will provide the water supply during operation phase of the project.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? Yes Runoff may increase due to increased paved area. However, Increased Runoff will be managed by well designed storm water management system.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Transfer of material will be done by covered vehicles to the construction site. During operational phase about 790 ECS will be added.
1.26 Long-term dismantling or decommissioning or restoration works? No None envisaged
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No None envisaged
1.28 Influx of people to an area in either temporarily or permanently? Yes During operation the residential project will be occupied by various type of population.
1.29 Introduction of alien species? No None envisaged
1.30 Loss of native species or genetic diversity? No None envisaged
1.31 Any other actions? No None envisaged
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes Undeveloped land. Plot Area: 7.66 ha (76650.0 m2)
2.2 Water (expected source & competing users) unit: KLD Yes Total water requirement for the project is 1277 KLD and fresh water supply will be 851 KLD. Source of the water Municipal Water Supply. Water requirement details are enclosed as Annexure-II.
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Coarse & Fine Aggregate, Granite, Kota stone, marble bricks, sand, cement, steel. From local traders or nearby sites.
2.5 Forests and timber (source – MT) No Not Applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes During Operation about 3967 KW power will be required for the Project and it will be sourced from State Electricity Board. DG set will be provided as a backup power source.
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Paints and HSD will be used during construction Phase of the project. These will be stored as per the Norms.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No None envisaged
3.3 Affect the welfare of people e.g. by changing living conditions? No Socio Economic conditions will be improved as the building will employ people.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes Yes Due to excavation Top Soil and stone will be generated. Top soil will be stored separately and will be used for greenbelt and green cover area. Other waste will be used for refilling and surplus quantity will be disposed as per Municipal Norms.
4.2 Municipal waste (domestic and or commercial wastes) Yes The total municipal waste generated from the proposed project is 4753.0 kg/day. Details enclosed as Annexure – III.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes During Construction phase Paint and used oil from DG sets will be generated and will be disposed as per norms. During Operational Phase Used oil from DG set will be generated and it will be sold to authorized vendor.
4.4 Other industrial process wastes No Not Applicable
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes Sludge from STP sent to greenbelt development.
4.7 Construction or demolition wastes Yes • Bio-degradable/ Non bio-degradable waste will be sent to municipal solid waste management facility. • Recyclable waste is sold to local vendors.
4.8 Redundant machinery or equipment No Most of the equipment used for the construction will be hired and any surplus equipment and material that is found will be sold off to the appropriate agencies.
4.9 Contaminated soils or other materials No No soil Contamination is anticipated as the proposed project being a construction project all the waste generated will be recyclable in nature (Domestic in nature).
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes Yes Solid Waste like rubbles, used up cement, broken bricks etc which shall be used for filling up of low lying areas during development stage.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Emissions will be mainly from vehicles running at the project site during construction and operation period and secondly from the DG set used for backup power source (during power failures only for a short duration). High Speed Diesel (HSD) will be used for the DG sets. The main emissions will be SO2 and NOx The D.G Set will be acoustically enclosed so as to meet the norms laid down by CPCB. Moreover proper stack height will also be provided as per CPCB Norms to ensure proper dispersion of these
5.2 Emissions from production processes No Not Applicable as this is a construction project
5.3 Emissions from materials handling including storage or transport Yes The main emissions during the construction will be PM (Particulate Matter) from loading and unloading of material on the site. SO2 and NOx from the combustion of fossil fuels and from the vehicles. The particulate matter will be controlled by sprinkling water at regular intervals on paved roads. The SO2 and NOx will be controlled by proper maintenance of the vehicles.
5.4 Emissions from construction activities including plant and equipment Yes Fugitive emissions are likely during the construction activities due to use of construction equipment. These are temporary in nature. The main emissions during the construction will be PM from the loading and unloading of materials on the site. SO2 and NOx from the combustion of fuels in construction equipment used which would be controlled.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Fugitive emissions are likely during the construction activities due to use of construction equipment. These are temporary in nature. The main emissions during the construction will be PM from the loading and unloading of materials on the site.
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not Applicable
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise level of 75 dB (A) is anticipated during activities such as drilling, concrete mixing and crushing etc. These are temporary in nature and will be minimized by adopting proper maintenance such as greasing oiling and insulations (enclosures) for noise abatement.
6.2 From industrial or similar processes No Not Applicable as this is a construction project.
6.3 From construction or demolition Yes Construction activities such as Site preparation, Laying of roads, Drilling, Crushing.
6.4 From blasting or piling No Not Applicable as no blasting involved
6.5 From construction or operational traffic Yes Vehicles or Trucks shifting the load from one place to another during Construction Phase. Car and Two wheelers will be added during operational Phase of the project.
6.6 From lighting or cooling systems No Not Applicable
6.7 From any other sources Yes From DG set noise is anticipated but this will be for a very short period of time during power failures.
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Paints and Fuel Oil for DG sets will be used. All Paints and HSD will be stored in Covered area. All other solid waste will be stored and disposed as per the municipal norms.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No The domestic waste will be passed through the closed conduits/ drains/ sewer lines to the STP for the treatment, part of the treated water is reused for flushing and green belt
7.3 By deposition of pollutants emitted to air into the land or into water No In Building and construction project the air pollutants are minimal; to minimize the same greenbelt will be developed along the boundary and roads.
7.4 From any other sources No None envisaged
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Proper Environmental Management Plan will be followed for air, water, noise pollution and solid waste management. Hence no long term impacts are envisaged and this being a construction project the impact felt on the area will be temporary in nature as most of the impacts are all construction impacts.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Fire Fighting systems will be installed and safety precautions will be followed as per the safety rules. Basement shall be designed with due considerations for Structural and fire safety.
8.2 From any other causes No Not Applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No None envisaged. The project site falls in the seismic zone-II, which is seismically least active zone.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Yes both construction and operation phase will enhance the supporting, utilities, ancillary development in the area around. Improved aesthetic look by avenue plantation and landscape development.
9.2 Lead to after-use of the site, which could have an impact on the environment Yes A positive impact on the environment in the area is anticipated due to the development of green belt.
9.3 Set a precedent for later developments Yes The proposed development will facilitate further sustainable development of Residential area.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No None envisaged as the proposed development is a construction project.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Ralamandal Wild Life Sanctuary Krishnapura Chhatries Lal Bag Palace
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Bilwali Tank River Khan Khaman Water Tank Kankavati nala
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Ralamandal Sanctuary - 6.50 Km
4 Inland, coastal, marine or underground waters No Not Applicable
5 State, National boundaries No No State Boundary within 15 km.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes NH3
7 Defence installations No Not Applicable
8 Densely populated or built-up area Yes Rau Indore
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Hospitals, Schools, Places of worship and Community Facilities are present near the site.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Notified zone by Central Ground water Board
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No The Site Fall under the Zone II as per the Seismic Zone Map of India.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No NA
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)06/05/2019Kindly upload declaration regarding construction activities commenced on the proposed site and conceptual plan of the project.
(2.)27/09/2019The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMahesh Sharma
DesignationSE
Name of Company (Applicant Name should not be given here)M/S. INDORE MUNICIPAL CORPORATION
AddressKhasra no 220, Sanawadia Village, Indore Mandal & District, Madhya Pradesh
Print